{"id":8922,"date":"2025-05-23T11:54:00","date_gmt":"2025-05-23T09:54:00","guid":{"rendered":"https:\/\/www.arosip.com\/2025\/05\/23\/future-of-urban-mobility-in-munich\/"},"modified":"2026-01-14T12:11:23","modified_gmt":"2026-01-14T11:11:23","slug":"future-of-urban-mobility-in-munich","status":"publish","type":"post","link":"https:\/\/www.arosip.com\/en\/future-of-urban-mobility-in-munich\/","title":{"rendered":"Future of urban mobility in Munich"},"content":{"rendered":"\n<p>The new Munich S-Bahn trains built by Siemens Mobility will feature braking and coupling systems supplied by Knorr-Bremse. | \u00a9 Siemens Mobility <\/p>\n\n<p><strong>Aros Industripartner AB<\/strong> Supports the Future of Urban Mobility in Munich! <br\/><br\/>We\u2019re excited to share that AROS IP has been awarded a role as a sub-supplier for a major rail project that will enhance public transportation in Munich. As part of this collaboration, we will supply a crucial component for the coupler system in the city\u2019s new S-Bahn trains. <br\/><br\/>Our contribution supports <strong>Knorr-Bremse Rail Vehicle Systems<\/strong> in delivering advanced coupling systems designed to improve energy efficiency, reduce lifecycle costs, and maximize vehicle availability for the expanding S-Bahn network.<br\/><br\/>This project is set to significantly increase passenger capacity and enhance daily travel for thousands across the region \u2014 and we\u2019re proud to be part of it.<br\/><br\/>\ud83d\ude80 Delivery of the new rail vehicles is expected to begin at the end of 2028.<br\/><br\/>Learn more about the project: https:\/\/newsroom.knorr-bremse.com\/en\/munich-s-bahn-knorr-bremse-supplies-system-technologies-for-siemens-mobility-suburban-trains\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new Munich S-Bahn trains built by Siemens Mobility will feature braking and coupling systems supplied by Knorr-Bremse. | \u00a9 Siemens Mobility Aros Industripartner AB Supports the Future of Urban Mobility in Munich! We\u2019re excited to share that AROS IP has been awarded a role as a sub-supplier for a major rail project that will [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":8923,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-8922","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-okategoriserad"],"_links":{"self":[{"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/posts\/8922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/comments?post=8922"}],"version-history":[{"count":1,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/posts\/8922\/revisions"}],"predecessor-version":[{"id":8924,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/posts\/8922\/revisions\/8924"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/media\/8923"}],"wp:attachment":[{"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/media?parent=8922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/categories?post=8922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arosip.com\/en\/wp-json\/wp\/v2\/tags?post=8922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}